{"help": "https://datosabiertos.bogota.gov.co/en/api/3/action/help_show?name=datastore_search", "success": true, "result": {"include_total": true, "limit": 100, "records_format": "objects", "resource_id": "43564269-ea5a-4ad8-b05c-83486661538c", "total_estimation_threshold": null, "records": [{"_id":1,"CIV":"1008281","PK":"91010811","FECHA_INICIO":"2026-01-19 00:00:00","FECHA_TERMINACION":"30/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 1","LOCALIDAD":"USAQUEN","BARRIO":"CANAIMA","EJE":"CL 191A","DESDE":"KR 11A","HASTA":"Sin Establecer","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Acuerdo 761/2020/A","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Parcheo-Bacheo","AREA_PK":"661.2","LONGITUD PK":"108.87","KM_CARRIL_IMPACTO":"0.19","KM_LINEAL_CALCULADO":"0.11","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.19","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.19","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.19","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"651","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"651","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"ANGEL RICARDO IBAGON","NOMBRE_INGENIERO_APOYO":"JHON SEBASTIAN NINO MARTINEZ"},{"_id":2,"CIV":"1008283","PK":"91010810","FECHA_INICIO":"2026-01-05 00:00:00","FECHA_TERMINACION":"30/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 1","LOCALIDAD":"USAQUEN","BARRIO":"CANAIMA","EJE":"KR 11A","DESDE":"Sin Establecer","HASTA":"CL 191A","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Acuerdo 761/2020/A","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Parcheo-Bacheo","AREA_PK":"1462.11","LONGITUD PK":"229.85","KM_CARRIL_IMPACTO":"0.42","KM_LINEAL_CALCULADO":"0.23","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.37","KM_IMPACTO_SELLO":"0.05","KM_CARRIL (TOTAL)":"0.42","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.42","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"1299.51","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"1299.51","NOMBRE_DIRECTOR_OBRA":"MARY LUZ MORA TORRES","NOMBRE_RESIDENTE_OBRA":"ANGEL RICARDO IBAGON","NOMBRE_INGENIERO_APOYO":"JHON SEBASTIAN NINO MARTINEZ"},{"_id":3,"CIV":"13002759","PK":"34010213","FECHA_INICIO":"2025-12-19 00:00:00","FECHA_TERMINACION":"02/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 2","LOCALIDAD":"TEUSAQUILLO","BARRIO":"CENTRO ADMINISTRATIVO OCC.","EJE":"AC 26","DESDE":"KR 54","HASTA":"KR 57","TIPO DE MALLA":"Arterial","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA CICLOINFRAESTRUCTURA","DESCRIPCION_PROGRAMA":"Acuerdo 761/2020/F","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Parcheo-Bacheo","AREA_PK":"603.58","LONGITUD PK":"196.02","KM_CARRIL_IMPACTO":"0.17","KM_LINEAL_CALCULADO":"0.2","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.17","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.17","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.17","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"594.69","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"594.69","NOMBRE_DIRECTOR_OBRA":"CESAR DIEGO ORTIZ CARMONA","NOMBRE_RESIDENTE_OBRA":"ANDREA DEL PILAR PRADA","NOMBRE_INGENIERO_APOYO":"JESICA ALEXANDRA ARDILA DIAZ"},{"_id":4,"CIV":"13000210","PK":"181942","FECHA_INICIO":"2026-01-05 00:00:00","FECHA_TERMINACION":"09/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 2","LOCALIDAD":"TEUSAQUILLO","BARRIO":"EL SALITRE","EJE":"KR 66A","DESDE":"CL 41","HASTA":"CL 41A","TIPO DE MALLA":"Intermedia","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Acuerdo 761/2020/A","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Parcheo-Bacheo","AREA_PK":"458.06","LONGITUD PK":"64.26","KM_CARRIL_IMPACTO":"0.13","KM_LINEAL_CALCULADO":"0.06","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.1","KM_IMPACTO_SELLO":"0.03","KM_CARRIL (TOTAL)":"0.13","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.13","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"356.36","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"356.36","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"YEFER ENRIQUE SANCHEZ GONZALEZ","NOMBRE_INGENIERO_APOYO":"ANDRES FELIPE ALDANA CHARRY"},{"_id":5,"CIV":"10004191","PK":"514582","FECHA_INICIO":"2025-12-15 00:00:00","FECHA_TERMINACION":"14/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 2","LOCALIDAD":"ENGATIVA","BARRIO":"ALAMOS","EJE":"AK 72","DESDE":"KR 103","HASTA":"KR 103 A","TIPO DE MALLA":"Arterial","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DEL ESPACIO PUBLICO","DESCRIPCION_PROGRAMA":"Convenio UMV-IDU/1396-2025","DESCRIPCION_ACTIVIDAD_AGRUPADA":"MP / Mantenimiento Periódico E.P.","AREA_PK":"158.23","LONGITUD PK":"29.06","KM_CARRIL_IMPACTO":"0.05","KM_LINEAL_CALCULADO":"0.03","KM LINEAL CONVENIOS 50%":"0.02","KM_CARRIL_OBRA":"0.04","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.04","KM CARRIL CONVENIOS 50%":"0.02","KM CARRIL SUMATORIO":"0.02","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"152.32","AREA 50% CONVENIOS":"76.16","AREA SUMATORIA":"76.16","NOMBRE_DIRECTOR_OBRA":"MANUEL ALFONSO AVILA QUINTANA","NOMBRE_RESIDENTE_OBRA":"RAMIRO HERNAN ROBLES ROBLES","NOMBRE_INGENIERO_APOYO":"SEBASTIAN HERRERA"},{"_id":6,"CIV":"11008023","PK":"168861","FECHA_INICIO":"2026-01-16 00:00:00","FECHA_TERMINACION":"16/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 1","LOCALIDAD":"SUBA","BARRIO":"PRADO PINZON","EJE":"KR 50","DESDE":"CL 142","HASTA":"CL 143","TIPO DE MALLA":"Intermedia","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Conservacion","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"313.68","LONGITUD PK":"44.89","KM_CARRIL_IMPACTO":"0.09","KM_LINEAL_CALCULADO":"0.04","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.09","KM_CARRIL (TOTAL)":"0.09","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.09","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"313.68","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"313.68","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"LADY CATERINE RESTREPO AVILA"},{"_id":7,"CIV":"11008093","PK":"168860","FECHA_INICIO":"2026-01-16 00:00:00","FECHA_TERMINACION":"16/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 1","LOCALIDAD":"SUBA","BARRIO":"PRADO PINZON","EJE":"KR 50","DESDE":"CL 141","HASTA":"CL 142","TIPO DE MALLA":"Intermedia","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Conservacion","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"294.53","LONGITUD PK":"44.92","KM_CARRIL_IMPACTO":"0.08","KM_LINEAL_CALCULADO":"0.04","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.08","KM_CARRIL (TOTAL)":"0.08","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.08","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"294.53","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"294.53","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"LADY CATERINE RESTREPO AVILA"},{"_id":8,"CIV":"11009801","PK":"167303","FECHA_INICIO":"2026-01-06 00:00:00","FECHA_TERMINACION":"06/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 1","LOCALIDAD":"SUBA","BARRIO":"PRADO VERANIEGO","EJE":"CL 128C","DESDE":"KR 52","HASTA":"KR 53","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"613.6","LONGITUD PK":"85.71","KM_CARRIL_IMPACTO":"0.18","KM_LINEAL_CALCULADO":"0.09","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.18","KM_CARRIL (TOTAL)":"0.18","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.18","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"613.6","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"613.6","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":9,"CIV":"11009504","PK":"167476","FECHA_INICIO":"2026-01-06 00:00:00","FECHA_TERMINACION":"06/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 1","LOCALIDAD":"SUBA","BARRIO":"PRADO VERANIEGO","EJE":"CL 132","DESDE":"KR 45A","HASTA":"KR 46","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Conservacion","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"520.57","LONGITUD PK":"85.22","KM_CARRIL_IMPACTO":"0.15","KM_LINEAL_CALCULADO":"0.09","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.15","KM_CARRIL (TOTAL)":"0.15","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.15","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"520.57","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"520.57","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":10,"CIV":"11009871","PK":"167531","FECHA_INICIO":"2026-01-06 00:00:00","FECHA_TERMINACION":"06/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 1","LOCALIDAD":"SUBA","BARRIO":"PRADO VERANIEGO","EJE":"KR 52","DESDE":"CL 128BBIS","HASTA":"CL 128C","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Conservacion","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"336.42","LONGITUD PK":"47.62","KM_CARRIL_IMPACTO":"0.1","KM_LINEAL_CALCULADO":"0.05","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.1","KM_CARRIL (TOTAL)":"0.1","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.1","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"336.42","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"336.42","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":11,"CIV":"11009993","PK":"167268","FECHA_INICIO":"2026-01-05 00:00:00","FECHA_TERMINACION":"05/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 1","LOCALIDAD":"SUBA","BARRIO":"PRADO VERANIEGO SUR","EJE":"CL 128A","DESDE":"KR 53C","HASTA":"KR 53D","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Conservacion","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"317.07","LONGITUD PK":"45.82","KM_CARRIL_IMPACTO":"0.09","KM_LINEAL_CALCULADO":"0.05","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.09","KM_CARRIL (TOTAL)":"0.09","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.09","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"317.07","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"317.07","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":12,"CIV":"11010067","PK":"167259","FECHA_INICIO":"2026-01-05 00:00:00","FECHA_TERMINACION":"05/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 1","LOCALIDAD":"SUBA","BARRIO":"CANODROMO","EJE":"CL 128A","DESDE":"KR 49","HASTA":"KR 49A","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Conservacion","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"301.08","LONGITUD PK":"42.54","KM_CARRIL_IMPACTO":"0.09","KM_LINEAL_CALCULADO":"0.04","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.09","KM_CARRIL (TOTAL)":"0.09","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.09","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"301.08","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"301.08","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":13,"CIV":"11010074","PK":"167258","FECHA_INICIO":"2026-01-05 00:00:00","FECHA_TERMINACION":"05/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 1","LOCALIDAD":"SUBA","BARRIO":"CANODROMO","EJE":"CL 128A","DESDE":"KR 47","HASTA":"KR 49","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Conservacion","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"599.03","LONGITUD PK":"85.84","KM_CARRIL_IMPACTO":"0.17","KM_LINEAL_CALCULADO":"0.09","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.17","KM_CARRIL (TOTAL)":"0.17","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.17","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"599.03","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"599.03","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":14,"CIV":"13002758","PK":"24189456","FECHA_INICIO":"2026-01-08 00:00:00","FECHA_TERMINACION":"21/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 2","LOCALIDAD":"TEUSAQUILLO","BARRIO":"CENTRO ADMINISTRATIVO OCC.","EJE":"AC 26","DESDE":"Sin Establecer","HASTA":"Sin Establecer","TIPO DE MALLA":"Arterial","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA CICLOINFRAESTRUCTURA","DESCRIPCION_PROGRAMA":"Acuerdo 761/2020/F","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Parcheo-Bacheo","AREA_PK":"84.87","LONGITUD PK":"34.31","KM_CARRIL_IMPACTO":"0.02","KM_LINEAL_CALCULADO":"0.03","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.01","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.01","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.01","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"31.85","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"31.85","NOMBRE_DIRECTOR_OBRA":"CESAR DIEGO ORTIZ CARMONA","NOMBRE_RESIDENTE_OBRA":"ANDREA DEL PILAR PRADA","NOMBRE_INGENIERO_APOYO":"JESICA ALEXANDRA ARDILA DIAZ"},{"_id":15,"CIV":"13002763","PK":"34010201","FECHA_INICIO":"2026-01-09 00:00:00","FECHA_TERMINACION":"21/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 2","LOCALIDAD":"TEUSAQUILLO","BARRIO":"EL SALITRE","EJE":"AC 26","DESDE":"AK 60","HASTA":"KR 66","TIPO DE MALLA":"Arterial","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA CICLOINFRAESTRUCTURA","DESCRIPCION_PROGRAMA":"Acuerdo 761/2020/F","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"716.43","LONGITUD PK":"231.76","KM_CARRIL_IMPACTO":"0.2","KM_LINEAL_CALCULADO":"0.23","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.2","KM_CARRIL (TOTAL)":"0.2","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.2","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"716.43","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"716.43","NOMBRE_DIRECTOR_OBRA":"CESAR DIEGO ORTIZ CARMONA","NOMBRE_RESIDENTE_OBRA":"ANDREA DEL PILAR PRADA","NOMBRE_INGENIERO_APOYO":"JESICA ALEXANDRA ARDILA DIAZ"},{"_id":16,"CIV":"14001176","PK":"182726","FECHA_INICIO":"2026-01-07 00:00:00","FECHA_TERMINACION":"07/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"SANTA ISABEL SUR","EJE":"KR 29B","DESDE":"CL 1C","HASTA":"CL 1D","TIPO DE MALLA":"Circuito Movilidad","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"381.1","LONGITUD PK":"54.84","KM_CARRIL_IMPACTO":"0.11","KM_LINEAL_CALCULADO":"0.05","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.11","KM_CARRIL (TOTAL)":"0.11","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.11","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"381.1","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"381.1","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":17,"CIV":"14001227","PK":"182710","FECHA_INICIO":"2026-01-07 00:00:00","FECHA_TERMINACION":"07/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"SANTA ISABEL SUR","EJE":"KR 29","DESDE":"CL 1C","HASTA":"CL 1D","TIPO DE MALLA":"Intermedia","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"423.06","LONGITUD PK":"56.36","KM_CARRIL_IMPACTO":"0.12","KM_LINEAL_CALCULADO":"0.06","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.12","KM_CARRIL (TOTAL)":"0.12","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.12","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"423.06","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"423.06","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":18,"CIV":"14001169","PK":"182833","FECHA_INICIO":"2026-01-07 00:00:00","FECHA_TERMINACION":"07/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"SANTA ISABEL SUR","EJE":"CL 1B","DESDE":"KR 29C","HASTA":"AK 30","TIPO DE MALLA":"Intermedia","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"841.66","LONGITUD PK":"79.53","KM_CARRIL_IMPACTO":"0.24","KM_LINEAL_CALCULADO":"0.08","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.24","KM_CARRIL (TOTAL)":"0.24","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.24","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"841.66","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"841.66","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":19,"CIV":"14001271","PK":"182709","FECHA_INICIO":"2026-01-07 00:00:00","FECHA_TERMINACION":"07/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"SANTA ISABEL SUR","EJE":"KR 29","DESDE":"CL 1B","HASTA":"CL 1C","TIPO DE MALLA":"Intermedia","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"390.51","LONGITUD PK":"52.84","KM_CARRIL_IMPACTO":"0.11","KM_LINEAL_CALCULADO":"0.05","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.11","KM_CARRIL (TOTAL)":"0.11","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.11","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"390.51","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"390.51","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":20,"CIV":"14001237","PK":"182689","FECHA_INICIO":"2026-01-14 00:00:00","FECHA_TERMINACION":"18/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"SANTA ISABEL SUR","EJE":"KR 28","DESDE":"CL 1D","HASTA":"CL 1DBIS","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"410.44","LONGITUD PK":"56.82","KM_CARRIL_IMPACTO":"0.12","KM_LINEAL_CALCULADO":"0.06","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.12","KM_CARRIL (TOTAL)":"0.12","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.12","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"410.44","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"410.44","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":21,"CIV":"14001177","PK":"182839","FECHA_INICIO":"2026-01-07 00:00:00","FECHA_TERMINACION":"07/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"SANTA ISABEL SUR","EJE":"CL 1C","DESDE":"KR 29B","HASTA":"KR 29C","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"622.47","LONGITUD PK":"85.22","KM_CARRIL_IMPACTO":"0.18","KM_LINEAL_CALCULADO":"0.09","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.18","KM_CARRIL (TOTAL)":"0.18","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.18","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"622.47","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"622.47","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":22,"CIV":"14001195","PK":"182690","FECHA_INICIO":"2026-01-14 00:00:00","FECHA_TERMINACION":"19/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"SANTA ISABEL SUR","EJE":"KR 28","DESDE":"CL 1DBIS","HASTA":"CL 1F","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"379.48","LONGITUD PK":"51.4","KM_CARRIL_IMPACTO":"0.11","KM_LINEAL_CALCULADO":"0.05","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.11","KM_CARRIL (TOTAL)":"0.11","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.11","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"379.48","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"379.48","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":23,"CIV":"14001282","PK":"182674","FECHA_INICIO":"2026-01-14 00:00:00","FECHA_TERMINACION":"19/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"SANTA ISABEL SUR","EJE":"KR 27A","DESDE":"CL 1D","HASTA":"CL 1DBIS","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"434.4","LONGITUD PK":"57.5","KM_CARRIL_IMPACTO":"0.12","KM_LINEAL_CALCULADO":"0.06","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.12","KM_CARRIL (TOTAL)":"0.12","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.12","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"434.4","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"434.4","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":24,"CIV":"14001283","PK":"182845","FECHA_INICIO":"2026-01-14 00:00:00","FECHA_TERMINACION":"16/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"SANTA ISABEL SUR","EJE":"CL 1D","DESDE":"KR 27A","HASTA":"KR 28","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"590.71","LONGITUD PK":"81.77","KM_CARRIL_IMPACTO":"0.17","KM_LINEAL_CALCULADO":"0.08","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.17","KM_CARRIL (TOTAL)":"0.17","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.17","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"590.71","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"590.71","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":25,"CIV":"14001382","PK":"182805","FECHA_INICIO":"2026-01-08 00:00:00","FECHA_TERMINACION":"08/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"SANTA ISABEL SUR","EJE":"CL 1","DESDE":"KR 29","HASTA":"KR 29B","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"544.84","LONGITUD PK":"86.45","KM_CARRIL_IMPACTO":"0.16","KM_LINEAL_CALCULADO":"0.09","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.16","KM_CARRIL (TOTAL)":"0.16","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.16","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"544.84","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"544.84","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":26,"CIV":"14001241","PK":"182737","FECHA_INICIO":"2026-01-06 00:00:00","FECHA_TERMINACION":"06/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"SANTA ISABEL SUR","EJE":"KR 29C","DESDE":"CL 1A","HASTA":"CL 1ABIS","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Conservacion","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"336.41","LONGITUD PK":"53.61","KM_CARRIL_IMPACTO":"0.1","KM_LINEAL_CALCULADO":"0.05","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.1","KM_CARRIL (TOTAL)":"0.1","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.1","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"336.41","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"336.41","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":27,"CIV":"14001479","PK":"182803","FECHA_INICIO":"2026-01-08 00:00:00","FECHA_TERMINACION":"08/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"SANTA ISABEL SUR","EJE":"CL 1","DESDE":"KR 27A","HASTA":"KR 28","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"531.75","LONGITUD PK":"81.71","KM_CARRIL_IMPACTO":"0.15","KM_LINEAL_CALCULADO":"0.08","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.15","KM_CARRIL (TOTAL)":"0.15","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.15","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"531.75","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"531.75","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":28,"CIV":"14001472","PK":"182683","FECHA_INICIO":"2026-01-08 00:00:00","FECHA_TERMINACION":"08/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"SANTA ISABEL SUR","EJE":"KR 28","DESDE":"CL 8 S","HASTA":"CL 1","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"380.9","LONGITUD PK":"50.68","KM_CARRIL_IMPACTO":"0.11","KM_LINEAL_CALCULADO":"0.05","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.11","KM_CARRIL (TOTAL)":"0.11","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.11","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"380.9","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"380.9","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":29,"CIV":"14001433","PK":"182804","FECHA_INICIO":"2026-01-08 00:00:00","FECHA_TERMINACION":"08/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"SANTA ISABEL SUR","EJE":"CL 1","DESDE":"KR 28","HASTA":"KR 29","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"546.6","LONGITUD PK":"88.16","KM_CARRIL_IMPACTO":"0.16","KM_LINEAL_CALCULADO":"0.09","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.16","KM_CARRIL (TOTAL)":"0.16","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.16","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"546.6","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"546.6","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":30,"CIV":"14001228","PK":"182838","FECHA_INICIO":"2026-01-07 00:00:00","FECHA_TERMINACION":"07/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"SANTA ISABEL SUR","EJE":"CL 1C","DESDE":"KR 29","HASTA":"KR 29B","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"579.73","LONGITUD PK":"82.88","KM_CARRIL_IMPACTO":"0.17","KM_LINEAL_CALCULADO":"0.08","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.17","KM_CARRIL (TOTAL)":"0.17","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.17","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"579.73","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"579.73","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":31,"CIV":"14001248","PK":"182854","FECHA_INICIO":"2026-01-14 00:00:00","FECHA_TERMINACION":"19/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"SANTA ISABEL SUR","EJE":"CL 1DBIS","DESDE":"KR 27A","HASTA":"KR 28","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"555.06","LONGITUD PK":"81.94","KM_CARRIL_IMPACTO":"0.16","KM_LINEAL_CALCULADO":"0.08","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.16","KM_CARRIL (TOTAL)":"0.16","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.16","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"555.06","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"555.06","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":32,"CIV":"14001138","PK":"182882","FECHA_INICIO":"2026-01-09 00:00:00","FECHA_TERMINACION":"28/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"SANTA ISABEL","EJE":"CL 1F","DESDE":"KR 28A","HASTA":"KR 29","TIPO DE MALLA":"Intermedia","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"397.57","LONGITUD PK":"42.4","KM_CARRIL_IMPACTO":"0.11","KM_LINEAL_CALCULADO":"0.04","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.11","KM_CARRIL (TOTAL)":"0.11","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.11","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"397.57","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"397.57","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":33,"CIV":"14001104","PK":"182883","FECHA_INICIO":"2026-01-09 00:00:00","FECHA_TERMINACION":"28/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"SANTA ISABEL","EJE":"CL 1F","DESDE":"KR 29","HASTA":"KR 29B","TIPO DE MALLA":"Intermedia","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"876.19","LONGITUD PK":"82.92","KM_CARRIL_IMPACTO":"0.25","KM_LINEAL_CALCULADO":"0.08","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.25","KM_CARRIL (TOTAL)":"0.25","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.25","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"876.19","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"876.19","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":34,"CIV":"14001288","PK":"182887","FECHA_INICIO":"2026-01-20 00:00:00","FECHA_TERMINACION":"20/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"SANTA ISABEL","EJE":"CL 1G","DESDE":"KR 26","HASTA":"KR 26A","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Conservacion","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"631.62","LONGITUD PK":"91.84","KM_CARRIL_IMPACTO":"0.18","KM_LINEAL_CALCULADO":"0.09","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.18","KM_CARRIL (TOTAL)":"0.18","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.18","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"631.62","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"631.62","NOMBRE_DIRECTOR_OBRA":"CARLOS ROBERTO CASTANO ALVAREZ","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"LADY CATERINE RESTREPO AVILA"},{"_id":35,"CIV":"14001053","PK":"182729","FECHA_INICIO":"2026-01-08 00:00:00","FECHA_TERMINACION":"08/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"SANTA ISABEL","EJE":"KR 29B","DESDE":"CL 1F","HASTA":"CL 1G","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"405.99","LONGITUD PK":"53.27","KM_CARRIL_IMPACTO":"0.12","KM_LINEAL_CALCULADO":"0.05","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.12","KM_CARRIL (TOTAL)":"0.12","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.12","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"405.99","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"405.99","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":36,"CIV":"14001039","PK":"182693","FECHA_INICIO":"2026-01-08 00:00:00","FECHA_TERMINACION":"08/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"SANTA ISABEL","EJE":"KR 28","DESDE":"CL 1H","HASTA":"CL 2","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"387.93","LONGITUD PK":"52.4","KM_CARRIL_IMPACTO":"0.11","KM_LINEAL_CALCULADO":"0.05","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.11","KM_CARRIL (TOTAL)":"0.11","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.11","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"387.93","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"387.93","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":37,"CIV":"14000893","PK":"182696","FECHA_INICIO":"2026-01-16 00:00:00","FECHA_TERMINACION":"16/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"SANTA ISABEL","EJE":"KR 28A","DESDE":"CL 2C","HASTA":"CL 3","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"338.22","LONGITUD PK":"49.29","KM_CARRIL_IMPACTO":"0.1","KM_LINEAL_CALCULADO":"0.05","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.1","KM_CARRIL (TOTAL)":"0.1","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.1","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"338.22","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"338.22","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"LADY CATERINE RESTREPO AVILA"},{"_id":38,"CIV":"14001011","PK":"182995","FECHA_INICIO":"2026-01-15 00:00:00","FECHA_TERMINACION":"15/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"SANTA ISABEL","EJE":"CL 2B","DESDE":"AK 27","HASTA":"KR 27A","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"416.57","LONGITUD PK":"56.39","KM_CARRIL_IMPACTO":"0.12","KM_LINEAL_CALCULADO":"0.06","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.12","KM_CARRIL (TOTAL)":"0.12","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.12","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"416.57","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"416.57","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":39,"CIV":"14000976","PK":"182996","FECHA_INICIO":"2026-01-15 00:00:00","FECHA_TERMINACION":"15/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"SANTA ISABEL","EJE":"CL 2B","DESDE":"KR 27A","HASTA":"KR 28A","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"601.04","LONGITUD PK":"88.84","KM_CARRIL_IMPACTO":"0.17","KM_LINEAL_CALCULADO":"0.09","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.17","KM_CARRIL (TOTAL)":"0.17","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.17","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"601.04","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"601.04","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":40,"CIV":"14000900","PK":"182998","FECHA_INICIO":"2026-01-15 00:00:00","FECHA_TERMINACION":"15/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"SANTA ISABEL","EJE":"CL 2B","DESDE":"KR 28ABIS","HASTA":"KR 29","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"290.66","LONGITUD PK":"42.44","KM_CARRIL_IMPACTO":"0.08","KM_LINEAL_CALCULADO":"0.04","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.08","KM_CARRIL (TOTAL)":"0.08","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.08","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"290.66","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"290.66","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":41,"CIV":"14000921","PK":"182997","FECHA_INICIO":"2026-01-15 00:00:00","FECHA_TERMINACION":"15/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"SANTA ISABEL","EJE":"CL 2B","DESDE":"KR 28A","HASTA":"KR 28ABIS","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"323.1","LONGITUD PK":"45.82","KM_CARRIL_IMPACTO":"0.09","KM_LINEAL_CALCULADO":"0.05","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.09","KM_CARRIL (TOTAL)":"0.09","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.09","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"323.1","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"323.1","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":42,"CIV":"14000945","PK":"183000","FECHA_INICIO":"2026-01-19 00:00:00","FECHA_TERMINACION":"19/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"SANTA ISABEL","EJE":"CL 2C","DESDE":"KR 27A","HASTA":"KR 28A","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Conservacion","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"504.69","LONGITUD PK":"84.97","KM_CARRIL_IMPACTO":"0.14","KM_LINEAL_CALCULADO":"0.08","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.14","KM_CARRIL (TOTAL)":"0.14","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.14","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"504.69","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"504.69","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"LADY CATERINE RESTREPO AVILA"},{"_id":43,"CIV":"14000975","PK":"182681","FECHA_INICIO":"2026-01-19 00:00:00","FECHA_TERMINACION":"19/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"SANTA ISABEL","EJE":"KR 27A","DESDE":"CL 2B","HASTA":"CL 2C","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"344.28","LONGITUD PK":"48.3","KM_CARRIL_IMPACTO":"0.1","KM_LINEAL_CALCULADO":"0.05","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.1","KM_CARRIL (TOTAL)":"0.1","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.1","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"344.28","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"344.28","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"LADY CATERINE RESTREPO AVILA"},{"_id":44,"CIV":"14000762","PK":"183085","FECHA_INICIO":"2026-01-21 00:00:00","FECHA_TERMINACION":"21/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"VERAGUAS","EJE":"CL 5A","DESDE":"KR 27B","HASTA":"KR 28A","TIPO DE MALLA":"Intermedia","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"750.33","LONGITUD PK":"79.92","KM_CARRIL_IMPACTO":"0.21","KM_LINEAL_CALCULADO":"0.08","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.21","KM_CARRIL (TOTAL)":"0.21","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.21","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"750.33","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"750.33","NOMBRE_DIRECTOR_OBRA":"CARLOS ROBERTO CASTANO ALVAREZ","NOMBRE_RESIDENTE_OBRA":"ANGEL RICARDO IBAGON","NOMBRE_INGENIERO_APOYO":"LADY CATERINE RESTREPO AVILA"},{"_id":45,"CIV":"14000729","PK":"182765","FECHA_INICIO":"2026-01-20 00:00:00","FECHA_TERMINACION":"20/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"VERAGUAS","EJE":"KR 28A","DESDE":"CL 5A","HASTA":"CL 5B","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Conservacion","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"512.86","LONGITUD PK":"78.11","KM_CARRIL_IMPACTO":"0.15","KM_LINEAL_CALCULADO":"0.08","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.15","KM_CARRIL (TOTAL)":"0.15","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.15","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"512.86","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"512.86","NOMBRE_DIRECTOR_OBRA":"CARLOS ROBERTO CASTANO ALVAREZ","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"LADY CATERINE RESTREPO AVILA"},{"_id":46,"CIV":"14000761","PK":"182777","FECHA_INICIO":"2026-01-20 00:00:00","FECHA_TERMINACION":"20/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"VERAGUAS","EJE":"KR 27B","DESDE":"CL 5A","HASTA":"CL 5B","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"453.82","LONGITUD PK":"77.62","KM_CARRIL_IMPACTO":"0.13","KM_LINEAL_CALCULADO":"0.08","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.13","KM_CARRIL (TOTAL)":"0.13","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.13","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"453.82","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"453.82","NOMBRE_DIRECTOR_OBRA":"CARLOS ROBERTO CASTANO ALVAREZ","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"LADY CATERINE RESTREPO AVILA"},{"_id":47,"CIV":"14000750","PK":"183106","FECHA_INICIO":"2026-01-20 00:00:00","FECHA_TERMINACION":"20/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"VERAGUAS","EJE":"CL 5B","DESDE":"AK 27","HASTA":"KR 27B","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"470.31","LONGITUD PK":"76.91","KM_CARRIL_IMPACTO":"0.13","KM_LINEAL_CALCULADO":"0.08","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.13","KM_CARRIL (TOTAL)":"0.13","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.13","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"470.31","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"470.31","NOMBRE_DIRECTOR_OBRA":"CARLOS ROBERTO CASTANO ALVAREZ","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"LADY CATERINE RESTREPO AVILA"},{"_id":48,"CIV":"14000707","PK":"183107","FECHA_INICIO":"2026-01-19 00:00:00","FECHA_TERMINACION":"19/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"VERAGUAS","EJE":"CL 5C","DESDE":"KR 27B","HASTA":"KR 28A","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"460.87","LONGITUD PK":"74.21","KM_CARRIL_IMPACTO":"0.13","KM_LINEAL_CALCULADO":"0.07","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.13","KM_CARRIL (TOTAL)":"0.13","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.13","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"460.87","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"460.87","NOMBRE_DIRECTOR_OBRA":"CARLOS ROBERTO CASTANO ALVAREZ","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"LADY CATERINE RESTREPO AVILA"},{"_id":49,"CIV":"14000788","PK":"182776","FECHA_INICIO":"2026-01-20 00:00:00","FECHA_TERMINACION":"20/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"VERAGUAS","EJE":"KR 27B","DESDE":"CL 5","HASTA":"CL 5A","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Conservacion","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"295.02","LONGITUD PK":"44.87","KM_CARRIL_IMPACTO":"0.08","KM_LINEAL_CALCULADO":"0.04","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.08","KM_CARRIL (TOTAL)":"0.08","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.08","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"295.02","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"295.02","NOMBRE_DIRECTOR_OBRA":"CARLOS ROBERTO CASTANO ALVAREZ","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"LADY CATERINE RESTREPO AVILA"},{"_id":50,"CIV":"14000821","PK":"182757","FECHA_INICIO":"2026-01-19 00:00:00","FECHA_TERMINACION":"19/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"EL PROGRESO","EJE":"KR 26A","DESDE":"CL 5A","HASTA":"CL 5C","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"675.89","LONGITUD PK":"106.62","KM_CARRIL_IMPACTO":"0.19","KM_LINEAL_CALCULADO":"0.11","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.19","KM_CARRIL (TOTAL)":"0.19","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.19","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"675.89","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"675.89","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"LADY CATERINE RESTREPO AVILA"},{"_id":51,"CIV":"14001125","PK":"183047","FECHA_INICIO":"2026-01-21 00:00:00","FECHA_TERMINACION":"21/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"EL PROGRESO","EJE":"CL 4B","DESDE":"KR 21","HASTA":"TV 20A","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Conservacion","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"104.99","LONGITUD PK":"15.23","KM_CARRIL_IMPACTO":"0.03","KM_LINEAL_CALCULADO":"0.02","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.03","KM_CARRIL (TOTAL)":"0.03","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.03","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"104.99","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"104.99","NOMBRE_DIRECTOR_OBRA":"CARLOS ROBERTO CASTANO ALVAREZ","NOMBRE_RESIDENTE_OBRA":"ANGEL RICARDO IBAGON","NOMBRE_INGENIERO_APOYO":"LADY CATERINE RESTREPO AVILA"},{"_id":52,"CIV":"14000278","PK":"183799","FECHA_INICIO":"2026-01-22 00:00:00","FECHA_TERMINACION":"22/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"SANTA FE","EJE":"CL 22","DESDE":"KR 18","HASTA":"KR 18A","TIPO DE MALLA":"Intermedia","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"986.04","LONGITUD PK":"96.4","KM_CARRIL_IMPACTO":"0.28","KM_LINEAL_CALCULADO":"0.1","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.28","KM_CARRIL (TOTAL)":"0.28","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.28","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"986.04","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"986.04","NOMBRE_DIRECTOR_OBRA":"CARLOS ROBERTO CASTANO ALVAREZ","NOMBRE_RESIDENTE_OBRA":"ANGEL RICARDO IBAGON","NOMBRE_INGENIERO_APOYO":"LADY CATERINE RESTREPO AVILA"},{"_id":53,"CIV":"14000265","PK":"183827","FECHA_INICIO":"2026-01-21 00:00:00","FECHA_TERMINACION":"21/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"SANTA FE","EJE":"DG 22CBIS","DESDE":"KR 18","HASTA":"KR 18BIS","TIPO DE MALLA":"Intermedia","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"926.76","LONGITUD PK":"96.28","KM_CARRIL_IMPACTO":"0.26","KM_LINEAL_CALCULADO":"0.1","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.26","KM_CARRIL (TOTAL)":"0.26","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.26","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"926.76","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"926.76","NOMBRE_DIRECTOR_OBRA":"CARLOS ROBERTO CASTANO ALVAREZ","NOMBRE_RESIDENTE_OBRA":"ANGEL RICARDO IBAGON","NOMBRE_INGENIERO_APOYO":"LADY CATERINE RESTREPO AVILA"},{"_id":54,"CIV":"14000301","PK":"183798","FECHA_INICIO":"2026-01-22 00:00:00","FECHA_TERMINACION":"22/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"SANTA FE","EJE":"CL 22","DESDE":"KR 17","HASTA":"CL 22","TIPO DE MALLA":"Intermedia","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"687.79","LONGITUD PK":"65.61","KM_CARRIL_IMPACTO":"0.2","KM_LINEAL_CALCULADO":"0.07","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.2","KM_CARRIL (TOTAL)":"0.2","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.2","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"687.79","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"687.79","NOMBRE_DIRECTOR_OBRA":"CARLOS ROBERTO CASTANO ALVAREZ","NOMBRE_RESIDENTE_OBRA":"ANGEL RICARDO IBAGON","NOMBRE_INGENIERO_APOYO":"LADY CATERINE RESTREPO AVILA"},{"_id":55,"CIV":"14001713","PK":"472665","FECHA_INICIO":"2026-01-21 00:00:00","FECHA_TERMINACION":"21/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"SANTA FE","EJE":"DG 22CBIS","DESDE":"KR 18BIS","HASTA":"KR 18A","TIPO DE MALLA":"Intermedia","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"456.73","LONGITUD PK":"46.58","KM_CARRIL_IMPACTO":"0.13","KM_LINEAL_CALCULADO":"0.05","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.13","KM_CARRIL (TOTAL)":"0.13","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.13","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"456.73","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"456.73","NOMBRE_DIRECTOR_OBRA":"CARLOS ROBERTO CASTANO ALVAREZ","NOMBRE_RESIDENTE_OBRA":"ANGEL RICARDO IBAGON","NOMBRE_INGENIERO_APOYO":"LADY CATERINE RESTREPO AVILA"},{"_id":56,"CIV":"14000253","PK":"183834","FECHA_INICIO":"2026-01-21 00:00:00","FECHA_TERMINACION":"21/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"SANTA FE","EJE":"CL 22D","DESDE":"KR 18","HASTA":"KR 18BIS","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Conservacion","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"607.12","LONGITUD PK":"80.26","KM_CARRIL_IMPACTO":"0.17","KM_LINEAL_CALCULADO":"0.08","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.17","KM_CARRIL (TOTAL)":"0.17","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.17","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"607.12","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"607.12","NOMBRE_DIRECTOR_OBRA":"CARLOS ROBERTO CASTANO ALVAREZ","NOMBRE_RESIDENTE_OBRA":"ANGEL RICARDO IBAGON","NOMBRE_INGENIERO_APOYO":"LADY CATERINE RESTREPO AVILA"},{"_id":57,"CIV":"14000329","PK":"183652","FECHA_INICIO":"2026-01-26 00:00:00","FECHA_TERMINACION":"26/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"LA FAVORITA","EJE":"KR 18A","DESDE":"AC 19","HASTA":"CL 20","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"1255.75","LONGITUD PK":"119.72","KM_CARRIL_IMPACTO":"0.36","KM_LINEAL_CALCULADO":"0.12","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.36","KM_CARRIL (TOTAL)":"0.36","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.36","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"1255.75","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"1255.75","NOMBRE_DIRECTOR_OBRA":"CARLOS ROBERTO CASTANO ALVAREZ","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"LADY CATERINE RESTREPO AVILA"},{"_id":58,"CIV":"14000312","PK":"183780","FECHA_INICIO":"2026-01-26 00:00:00","FECHA_TERMINACION":"26/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"LA FAVORITA","EJE":"CL 20","DESDE":"KR 18","HASTA":"KR 18A","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"735.57","LONGITUD PK":"88.68","KM_CARRIL_IMPACTO":"0.21","KM_LINEAL_CALCULADO":"0.09","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.21","KM_CARRIL (TOTAL)":"0.21","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.21","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"735.57","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"735.57","NOMBRE_DIRECTOR_OBRA":"CARLOS ROBERTO CASTANO ALVAREZ","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"LADY CATERINE RESTREPO AVILA"},{"_id":59,"CIV":"14000295","PK":"183781","FECHA_INICIO":"2026-01-23 00:00:00","FECHA_TERMINACION":"23/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"LOS MARTIRES","BARRIO":"LA FAVORITA","EJE":"CL 20","DESDE":"KR 18A","HASTA":"KR 18B","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Sello de Fisuras","AREA_PK":"668.06","LONGITUD PK":"96.16","KM_CARRIL_IMPACTO":"0.19","KM_LINEAL_CALCULADO":"0.1","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0","KM_IMPACTO_SELLO":"0.19","KM_CARRIL (TOTAL)":"0.19","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.19","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"668.06","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"668.06","NOMBRE_DIRECTOR_OBRA":"CARLOS ROBERTO CASTANO ALVAREZ","NOMBRE_RESIDENTE_OBRA":"ANGEL RICARDO IBAGON","NOMBRE_INGENIERO_APOYO":"LADY CATERINE RESTREPO AVILA"},{"_id":60,"CIV":"2001383","PK":"7632","FECHA_INICIO":"2025-12-26 00:00:00","FECHA_TERMINACION":"08/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 2","LOCALIDAD":"CHAPINERO","BARRIO":"GRANADA","EJE":"KR 5","DESDE":"CL 65","HASTA":"CL 66","TIPO DE MALLA":"Intermedia","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DEL ESPACIO PUBLICO","DESCRIPCION_PROGRAMA":"Acuerdo 761/2020/E","DESCRIPCION_ACTIVIDAD_AGRUPADA":"MR / Mantenimiento Rutinario E.P.","AREA_PK":"238.49","LONGITUD PK":"98.44","KM_CARRIL_IMPACTO":"0.07","KM_LINEAL_CALCULADO":"0.1","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.07","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.07","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.07","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"238.49","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"238.49","NOMBRE_DIRECTOR_OBRA":"KARINA ALEXANDRA CARDONA NAVARRO","NOMBRE_RESIDENTE_OBRA":"ANDREA DEL PILAR PRADA","NOMBRE_INGENIERO_APOYO":"EDWARD ANDRES DIAZ CARRANZA"},{"_id":61,"CIV":"2001358","PK":"7634","FECHA_INICIO":"2026-01-07 00:00:00","FECHA_TERMINACION":"07/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 2","LOCALIDAD":"CHAPINERO","BARRIO":"GRANADA","EJE":"KR 5","DESDE":"CL 66","HASTA":"CL 66 A","TIPO DE MALLA":"Intermedia","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DEL ESPACIO PUBLICO","DESCRIPCION_PROGRAMA":"Acuerdo 761/2020/E","DESCRIPCION_ACTIVIDAD_AGRUPADA":"MR / Mantenimiento Rutinario E.P.","AREA_PK":"126.35","LONGITUD PK":"56.56","KM_CARRIL_IMPACTO":"0.04","KM_LINEAL_CALCULADO":"0.06","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.04","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.04","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.04","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"126.35","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"126.35","NOMBRE_DIRECTOR_OBRA":"KARINA ALEXANDRA CARDONA NAVARRO","NOMBRE_RESIDENTE_OBRA":"ANDREA DEL PILAR PRADA","NOMBRE_INGENIERO_APOYO":"EDWARD ANDRES DIAZ CARRANZA"},{"_id":62,"CIV":"2001345","PK":"9279","FECHA_INICIO":"2026-01-06 00:00:00","FECHA_TERMINACION":"20/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 2","LOCALIDAD":"CHAPINERO","BARRIO":"GRANADA","EJE":"CL 66 A","DESDE":"Sin Establecer","HASTA":"KR 5","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DEL ESPACIO PUBLICO","DESCRIPCION_PROGRAMA":"Acuerdo 761/2020/E","DESCRIPCION_ACTIVIDAD_AGRUPADA":"MP / Mantenimiento Periódico E.P.","AREA_PK":"71.94","LONGITUD PK":"43.01","KM_CARRIL_IMPACTO":"0.02","KM_LINEAL_CALCULADO":"0.04","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.02","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.02","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.02","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"71.94","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"71.94","NOMBRE_DIRECTOR_OBRA":"KARINA ALEXANDRA CARDONA NAVARRO","NOMBRE_RESIDENTE_OBRA":"ANDREA DEL PILAR PRADA","NOMBRE_INGENIERO_APOYO":"EDWARD ANDRES DIAZ CARRANZA"},{"_id":63,"CIV":"13000728","PK":"68946","FECHA_INICIO":"2026-01-05 00:00:00","FECHA_TERMINACION":"30/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 2","LOCALIDAD":"TEUSAQUILLO","BARRIO":"CIUDAD SALITRE SUR-ORIENTAL","EJE":"KR 64","DESDE":"CL 22 B","HASTA":"CL 23 A","TIPO DE MALLA":"Intermedia","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DEL ESPACIO PUBLICO","DESCRIPCION_PROGRAMA":"Acuerdo 761/2020/E","DESCRIPCION_ACTIVIDAD_AGRUPADA":"MP / Mantenimiento Periódico E.P.","AREA_PK":"245.42","LONGITUD PK":"80.01","KM_CARRIL_IMPACTO":"0.07","KM_LINEAL_CALCULADO":"0.08","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.07","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.07","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.07","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"245.42","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"245.42","NOMBRE_DIRECTOR_OBRA":"KARINA ALEXANDRA CARDONA NAVARRO","NOMBRE_RESIDENTE_OBRA":"ANDREA DEL PILAR PRADA","NOMBRE_INGENIERO_APOYO":"EDWARD ANDRES DIAZ CARRANZA"},{"_id":64,"CIV":"13000734","PK":"92056128","FECHA_INICIO":"2025-12-11 00:00:00","FECHA_TERMINACION":"26/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 2","LOCALIDAD":"TEUSAQUILLO","BARRIO":"CIUDAD SALITRE SUR-ORIENTAL","EJE":"KR 65","DESDE":"CL 22 A","HASTA":"CL 22 B","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DEL ESPACIO PUBLICO","DESCRIPCION_PROGRAMA":"Acuerdo 761/2020/E","DESCRIPCION_ACTIVIDAD_AGRUPADA":"MP / Mantenimiento Periódico E.P.","AREA_PK":"216.15","LONGITUD PK":"85.15","KM_CARRIL_IMPACTO":"0.06","KM_LINEAL_CALCULADO":"0.09","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.06","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.06","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.06","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"216.15","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"216.15","NOMBRE_DIRECTOR_OBRA":"KARINA ALEXANDRA CARDONA NAVARRO","NOMBRE_RESIDENTE_OBRA":"ANDREA DEL PILAR PRADA","NOMBRE_INGENIERO_APOYO":"EDWARD ANDRES DIAZ CARRANZA"},{"_id":65,"CIV":"1008213","PK":"24123432","FECHA_INICIO":"2026-01-06 00:00:00","FECHA_TERMINACION":"07/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 1","LOCALIDAD":"USAQUEN","BARRIO":"SANTA TERESA","EJE":"AK 7","DESDE":"CL 169","HASTA":"AC 170","TIPO DE MALLA":"Arterial","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Acuerdo 761/2020/A","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Parcheo-Bacheo","AREA_PK":"708.48","LONGITUD PK":"66.59","KM_CARRIL_IMPACTO":"0.2","KM_LINEAL_CALCULADO":"0.07","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.02","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.02","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.02","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"86.05","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"86.05","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"YEFER ENRIQUE SANCHEZ GONZALEZ","NOMBRE_INGENIERO_APOYO":"ANDRES FELIPE ALDANA CHARRY"},{"_id":66,"CIV":"8003977","PK":"604849","FECHA_INICIO":"2026-01-15 00:00:00","FECHA_TERMINACION":"21/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 5","LOCALIDAD":"KENNEDY","BARRIO":"CORABASTOS","EJE":"DG 38 S","DESDE":"TV 81BIS","HASTA":"TV 81BISA","TIPO DE MALLA":"Arterial","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Acuerdo 761/2020/C","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Parcheo-Bacheo","AREA_PK":"302.84","LONGITUD PK":"34.99","KM_CARRIL_IMPACTO":"0.09","KM_LINEAL_CALCULADO":"0.03","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.09","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.09","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.09","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"299.04","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"299.04","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":67,"CIV":"8012514","PK":"904468","FECHA_INICIO":"2026-01-19 00:00:00","FECHA_TERMINACION":"21/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 5","LOCALIDAD":"KENNEDY","BARRIO":"CORABASTOS","EJE":"KR 80C","DESDE":"DG 2","HASTA":"KR 80 C","TIPO DE MALLA":"Arterial","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Acuerdo 761/2020/A","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Parcheo-Bacheo","AREA_PK":"415.18","LONGITUD PK":"47","KM_CARRIL_IMPACTO":"0.12","KM_LINEAL_CALCULADO":"0.05","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.07","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.07","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.07","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"236.05","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"236.05","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":68,"CIV":"8014445","PK":"153745","FECHA_INICIO":"2026-01-20 00:00:00","FECHA_TERMINACION":"30/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 5","LOCALIDAD":"KENNEDY","BARRIO":"CORABASTOS","EJE":"KR 80 C","DESDE":"KR 80 C","HASTA":"DG 2","TIPO DE MALLA":"Arterial","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Acuerdo 761/2020/A","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Parcheo-Bacheo","AREA_PK":"414.13","LONGITUD PK":"45.96","KM_CARRIL_IMPACTO":"0.12","KM_LINEAL_CALCULADO":"0.05","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.08","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.08","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.08","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"287.6","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"287.6","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":69,"CIV":"8003960","PK":"603770","FECHA_INICIO":"2026-01-21 00:00:00","FECHA_TERMINACION":"24/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 5","LOCALIDAD":"KENNEDY","BARRIO":"CORABASTOS","EJE":"DG 38 S","DESDE":"TV 81BISA","HASTA":"TV 78B","TIPO DE MALLA":"Arterial","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Acuerdo 761/2020/C","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Parcheo-Bacheo","AREA_PK":"330.9","LONGITUD PK":"36.38","KM_CARRIL_IMPACTO":"0.09","KM_LINEAL_CALCULADO":"0.04","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.09","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.09","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.09","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"326.2","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"326.2","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":70,"CIV":"1001643","PK":"502633","FECHA_INICIO":"2026-01-06 00:00:00","FECHA_TERMINACION":"07/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 1","LOCALIDAD":"USAQUEN","BARRIO":"SANTA TERESA","EJE":"AK 7","DESDE":"KR 6 A","HASTA":"CL 167D","TIPO DE MALLA":"Arterial","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Acuerdo 761/2020/A","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Parcheo-Bacheo","AREA_PK":"2085.71","LONGITUD PK":"197.89","KM_CARRIL_IMPACTO":"0.6","KM_LINEAL_CALCULADO":"0.2","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.03","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.03","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.03","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"114.85","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"114.85","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"YEFER ENRIQUE SANCHEZ GONZALEZ","NOMBRE_INGENIERO_APOYO":"ANDRES FELIPE ALDANA CHARRY"},{"_id":71,"CIV":"1002207","PK":"502653","FECHA_INICIO":"2026-01-08 00:00:00","FECHA_TERMINACION":"08/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 1","LOCALIDAD":"USAQUEN","BARRIO":"SAN CRISTOBAL NORTE","EJE":"AK 7","DESDE":"CL 163","HASTA":"CL 163A","TIPO DE MALLA":"Arterial","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Acuerdo 761/2020/A","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Parcheo-Bacheo","AREA_PK":"770.95","LONGITUD PK":"77.76","KM_CARRIL_IMPACTO":"0.22","KM_LINEAL_CALCULADO":"0.08","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.03","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.03","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.03","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"94.86","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"94.86","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"YEFER ENRIQUE SANCHEZ GONZALEZ","NOMBRE_INGENIERO_APOYO":"ANDRES FELIPE ALDANA CHARRY"},{"_id":72,"CIV":"1006338","PK":"502850","FECHA_INICIO":"2026-01-20 00:00:00","FECHA_TERMINACION":"20/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 1","LOCALIDAD":"USAQUEN","BARRIO":"BARRANCAS NORTE","EJE":"AK 7","DESDE":"CL 158","HASTA":"Sin Establecer","TIPO DE MALLA":"Arterial","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Acuerdo 761/2020/A","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Parcheo-Bacheo","AREA_PK":"1837.08","LONGITUD PK":"182.82","KM_CARRIL_IMPACTO":"0.52","KM_LINEAL_CALCULADO":"0.18","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.05","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.05","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.05","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"183.94","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"183.94","NOMBRE_DIRECTOR_OBRA":"CARLOS ROBERTO CASTANO ALVAREZ","NOMBRE_RESIDENTE_OBRA":"YEFER ENRIQUE SANCHEZ GONZALEZ","NOMBRE_INGENIERO_APOYO":"ANDRES FELIPE ALDANA CHARRY"},{"_id":73,"CIV":"1003390","PK":"502870","FECHA_INICIO":"2026-01-23 00:00:00","FECHA_TERMINACION":"23/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 1","LOCALIDAD":"USAQUEN","BARRIO":"BARRANCAS","EJE":"AK 7","DESDE":"CL 153","HASTA":"CL 153A","TIPO DE MALLA":"Arterial","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Acuerdo 761/2020/A","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Parcheo-Bacheo","AREA_PK":"864.11","LONGITUD PK":"86.19","KM_CARRIL_IMPACTO":"0.25","KM_LINEAL_CALCULADO":"0.09","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.06","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.06","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.06","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"217.84","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"217.84","NOMBRE_DIRECTOR_OBRA":"CARLOS ROBERTO CASTANO ALVAREZ","NOMBRE_RESIDENTE_OBRA":"YEFER ENRIQUE SANCHEZ GONZALEZ","NOMBRE_INGENIERO_APOYO":"ANDRES FELIPE ALDANA CHARRY"},{"_id":74,"CIV":"1003533","PK":"502862","FECHA_INICIO":"2026-01-22 00:00:00","FECHA_TERMINACION":"22/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 1","LOCALIDAD":"USAQUEN","BARRIO":"BOSQUE DE PINOS III","EJE":"AK 7","DESDE":"CL 150","HASTA":"CL 152","TIPO DE MALLA":"Arterial","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Acuerdo 761/2020/A","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Parcheo-Bacheo","AREA_PK":"1718.6","LONGITUD PK":"172.15","KM_CARRIL_IMPACTO":"0.49","KM_LINEAL_CALCULADO":"0.17","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.09","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.09","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.09","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"311.5","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"311.5","NOMBRE_DIRECTOR_OBRA":"CARLOS ROBERTO CASTANO ALVAREZ","NOMBRE_RESIDENTE_OBRA":"YEFER ENRIQUE SANCHEZ GONZALEZ","NOMBRE_INGENIERO_APOYO":"ANDRES FELIPE ALDANA CHARRY"},{"_id":75,"CIV":"3002683","PK":"91025604","FECHA_INICIO":"2025-12-19 00:00:00","FECHA_TERMINACION":"19/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"SANTA FE","BARRIO":"PARQUE NACIONAL ORIENTAL","EJE":"Sin Establecer","DESDE":"Sin Establecer","HASTA":"Sin Establecer","TIPO DE MALLA":"Rural","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL RURAL","DESCRIPCION_PROGRAMA":"RURALIDAD","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Parcheo-Bacheo","AREA_PK":"6391.41","LONGITUD PK":"1061.97","KM_CARRIL_IMPACTO":"1.83","KM_LINEAL_CALCULADO":"1.06","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.66","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.66","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.66","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"2314.32","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"2314.32","NOMBRE_DIRECTOR_OBRA":"MARY LUZ MORA TORRES","NOMBRE_RESIDENTE_OBRA":"ANGEL RICARDO IBAGON","NOMBRE_INGENIERO_APOYO":"JHON SEBASTIAN NINO MARTINEZ"},{"_id":76,"CIV":"8003948","PK":"604844","FECHA_INICIO":"2026-01-24 00:00:00","FECHA_TERMINACION":"29/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 5","LOCALIDAD":"KENNEDY","BARRIO":"CORABASTOS","EJE":"DG 38 S","DESDE":"TV 81A","HASTA":"TV 81B","TIPO DE MALLA":"Arterial","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Acuerdo 761/2020/C","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Parcheo-Bacheo","AREA_PK":"299.84","LONGITUD PK":"35.05","KM_CARRIL_IMPACTO":"0.09","KM_LINEAL_CALCULADO":"0.04","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.08","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.08","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.08","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"292.02","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"292.02","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":77,"CIV":"8003994","PK":"604854","FECHA_INICIO":"2026-01-14 00:00:00","FECHA_TERMINACION":"14/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 5","LOCALIDAD":"KENNEDY","BARRIO":"CORABASTOS","EJE":"DG 38 S","DESDE":"TV 81","HASTA":"TV 81BIS","TIPO DE MALLA":"Arterial","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Acuerdo 761/2020/C","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Parcheo-Bacheo","AREA_PK":"286.93","LONGITUD PK":"33.38","KM_CARRIL_IMPACTO":"0.08","KM_LINEAL_CALCULADO":"0.03","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.07","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.07","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.07","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"232.5","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"232.5","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":78,"CIV":"10009693","PK":"513404","FECHA_INICIO":"2026-01-06 00:00:00","FECHA_TERMINACION":"06/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 2","LOCALIDAD":"ENGATIVA","BARRIO":"NORMANDIA","EJE":"AC 53","DESDE":"AK 70","HASTA":"KR 70D","TIPO DE MALLA":"Arterial","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Acuerdo 761/2020/A","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Parcheo-Bacheo","AREA_PK":"1069.88","LONGITUD PK":"124.44","KM_CARRIL_IMPACTO":"0.31","KM_LINEAL_CALCULADO":"0.12","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.03","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.03","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.03","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"95.6","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"95.6","NOMBRE_DIRECTOR_OBRA":"MARY LUZ MORA TORRES","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":79,"CIV":"15000069","PK":"184918","FECHA_INICIO":"2025-12-29 00:00:00","FECHA_TERMINACION":"21/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"ANTONIO NARIÑO","BARRIO":"LA FRAGUA","EJE":"KR 29D","DESDE":"CL 17B S","HASTA":"CL 18 S","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Acuerdo 761/2020/A","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Parcheo-Bacheo","AREA_PK":"289.7","LONGITUD PK":"46.51","KM_CARRIL_IMPACTO":"0.08","KM_LINEAL_CALCULADO":"0.05","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.08","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.08","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.08","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"273.48","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"273.48","NOMBRE_DIRECTOR_OBRA":"MARY LUZ MORA TORRES","NOMBRE_RESIDENTE_OBRA":"ANGEL RICARDO IBAGON","NOMBRE_INGENIERO_APOYO":"JHON SEBASTIAN NINO MARTINEZ"},{"_id":80,"CIV":"1001605","PK":"140872","FECHA_INICIO":"2026-01-24 00:00:00","FECHA_TERMINACION":"26/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 1","LOCALIDAD":"USAQUEN","BARRIO":"SANTA TERESA","EJE":"CL 165A","DESDE":"KR 8G","HASTA":"KR 8H","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Acuerdo 761/2020/A","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Parcheo-Bacheo","AREA_PK":"674.39","LONGITUD PK":"106.88","KM_CARRIL_IMPACTO":"0.19","KM_LINEAL_CALCULADO":"0.11","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.02","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.02","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.02","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"57.1","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"57.1","NOMBRE_DIRECTOR_OBRA":"CESAR DIEGO ORTIZ CARMONA","NOMBRE_RESIDENTE_OBRA":"DIEGO ALEJANDRO MORENO URREGO","NOMBRE_INGENIERO_APOYO":"CRYSTIAN CAMILO AMAYA SUAREZ"},{"_id":81,"CIV":"1008282","PK":"91010812","FECHA_INICIO":"2026-01-21 00:00:00","FECHA_TERMINACION":"30/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 1","LOCALIDAD":"USAQUEN","BARRIO":"CANAIMA","EJE":"KR 11A","DESDE":"CL 191A","HASTA":"CL 192","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Acuerdo 761/2020/A","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Parcheo-Bacheo","AREA_PK":"735.94","LONGITUD PK":"110.28","KM_CARRIL_IMPACTO":"0.21","KM_LINEAL_CALCULADO":"0.11","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.21","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.21","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.21","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"721.13","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"721.13","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"ANGEL RICARDO IBAGON","NOMBRE_INGENIERO_APOYO":"JHON SEBASTIAN NINO MARTINEZ"},{"_id":82,"CIV":"1005469","PK":"137082","FECHA_INICIO":"2025-12-01 00:00:00","FECHA_TERMINACION":"26/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 1","LOCALIDAD":"USAQUEN","BARRIO":"SANTA BIBIANA","EJE":"KR 18A","DESDE":"CL 103A","HASTA":"CL 104","TIPO DE MALLA":"Intermedia","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Acuerdo 761/2020/A","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Parcheo-Bacheo","AREA_PK":"321.15","LONGITUD PK":"44.14","KM_CARRIL_IMPACTO":"0.09","KM_LINEAL_CALCULADO":"0.04","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.05","KM_IMPACTO_SELLO":"0.04","KM_CARRIL (TOTAL)":"0.09","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.09","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"167.86","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"167.86","NOMBRE_DIRECTOR_OBRA":"MARY LUZ MORA TORRES","NOMBRE_RESIDENTE_OBRA":"YEFER ENRIQUE SANCHEZ GONZALEZ","NOMBRE_INGENIERO_APOYO":"ANDRES FELIPE ALDANA CHARRY"},{"_id":83,"CIV":"1005433","PK":"138911","FECHA_INICIO":"2025-12-01 00:00:00","FECHA_TERMINACION":"06/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 1","LOCALIDAD":"USAQUEN","BARRIO":"SANTA BIBIANA","EJE":"CL 104","DESDE":"KR 18A","HASTA":"AK 19","TIPO DE MALLA":"Intermedia","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Acuerdo 761/2020/A","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Parcheo-Bacheo","AREA_PK":"1034.98","LONGITUD PK":"77.76","KM_CARRIL_IMPACTO":"0.3","KM_LINEAL_CALCULADO":"0.08","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.1","KM_IMPACTO_SELLO":"0.2","KM_CARRIL (TOTAL)":"0.3","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.3","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"335.18","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"335.18","NOMBRE_DIRECTOR_OBRA":"MARY LUZ MORA TORRES","NOMBRE_RESIDENTE_OBRA":"YEFER ENRIQUE SANCHEZ GONZALEZ","NOMBRE_INGENIERO_APOYO":"ANDRES FELIPE ALDANA CHARRY"},{"_id":84,"CIV":"2000179","PK":"143508","FECHA_INICIO":"2026-01-16 00:00:00","FECHA_TERMINACION":"30/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 2","LOCALIDAD":"CHAPINERO","BARRIO":"CHICO NORTE II SECTOR","EJE":"CL 98","DESDE":"KR 9A","HASTA":"KR 9B","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Acuerdo 761/2020/A","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Parcheo-Bacheo","AREA_PK":"349.59","LONGITUD PK":"60.04","KM_CARRIL_IMPACTO":"0.1","KM_LINEAL_CALCULADO":"0.06","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.03","KM_IMPACTO_SELLO":"0.07","KM_CARRIL (TOTAL)":"0.1","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.1","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"94.91","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"94.91","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"YEFER ENRIQUE SANCHEZ GONZALEZ","NOMBRE_INGENIERO_APOYO":"ANDRES FELIPE ALDANA CHARRY"},{"_id":85,"CIV":"8004025","PK":"604859","FECHA_INICIO":"2026-01-09 00:00:00","FECHA_TERMINACION":"16/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 5","LOCALIDAD":"KENNEDY","BARRIO":"CORABASTOS","EJE":"DG 38 S","DESDE":"TV 81","HASTA":"TV 80H","TIPO DE MALLA":"Arterial","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Acuerdo 761/2020/C","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Parcheo-Bacheo","AREA_PK":"1739.75","LONGITUD PK":"156.94","KM_CARRIL_IMPACTO":"0.5","KM_LINEAL_CALCULADO":"0.16","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.25","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.25","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.25","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"863.53","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"863.53","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":86,"CIV":"9004048","PK":"390522","FECHA_INICIO":"2026-01-15 00:00:00","FECHA_TERMINACION":"16/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 3","LOCALIDAD":"FONTIBON","BARRIO":"SALITRE OCCIDENTAL","EJE":"CL 22A","DESDE":"Sin Establecer","HASTA":"KR 68B","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Convenio UMV-IDU/1396-2025","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Parcheo-Bacheo","AREA_PK":"1051.9","LONGITUD PK":"83.2","KM_CARRIL_IMPACTO":"0.3","KM_LINEAL_CALCULADO":"0.08","KM LINEAL CONVENIOS 50%":"0.04","KM_CARRIL_OBRA":"0.06","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.06","KM CARRIL CONVENIOS 50%":"0.03","KM CARRIL SUMATORIO":"0.03","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"211.29","AREA 50% CONVENIOS":"105.65","AREA SUMATORIA":"105.65","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"RAMIRO HERNAN ROBLES ROBLES","NOMBRE_INGENIERO_APOYO":"JEANPIERRE  GARZON VARELA"},{"_id":87,"CIV":"13003033","PK":"91032675","FECHA_INICIO":"2025-12-29 00:00:00","FECHA_TERMINACION":"14/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 2","LOCALIDAD":"TEUSAQUILLO","BARRIO":"CENTRO ADMINISTRATIVO OCC.","EJE":"CL 44","DESDE":"KR 45","HASTA":"AK 50","TIPO DE MALLA":"Intermedia","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Acuerdo 761/2020/A","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Parcheo-Bacheo","AREA_PK":"1929.81","LONGITUD PK":"280.07","KM_CARRIL_IMPACTO":"0.55","KM_LINEAL_CALCULADO":"0.28","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.34","KM_IMPACTO_SELLO":"0.21","KM_CARRIL (TOTAL)":"0.55","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.55","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"1183.7","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"1183.7","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":88,"CIV":"13000241","PK":"181940","FECHA_INICIO":"2026-01-06 00:00:00","FECHA_TERMINACION":"09/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 2","LOCALIDAD":"TEUSAQUILLO","BARRIO":"EL SALITRE","EJE":"KR 66A","DESDE":"AC 26","HASTA":"CL 41","TIPO DE MALLA":"Intermedia","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Acuerdo 761/2020/A","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Parcheo-Bacheo","AREA_PK":"430.22","LONGITUD PK":"54.68","KM_CARRIL_IMPACTO":"0.12","KM_LINEAL_CALCULADO":"0.05","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.04","KM_IMPACTO_SELLO":"0.08","KM_CARRIL (TOTAL)":"0.12","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.12","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"149.21","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"149.21","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"YEFER ENRIQUE SANCHEZ GONZALEZ","NOMBRE_INGENIERO_APOYO":"ANDRES FELIPE ALDANA CHARRY"},{"_id":89,"CIV":"13000146","PK":"181946","FECHA_INICIO":"2026-01-05 00:00:00","FECHA_TERMINACION":"09/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 2","LOCALIDAD":"TEUSAQUILLO","BARRIO":"EL SALITRE","EJE":"KR 66A","DESDE":"CL 42","HASTA":"CL 43","TIPO DE MALLA":"Intermedia","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Acuerdo 761/2020/A","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Parcheo-Bacheo","AREA_PK":"1010.61","LONGITUD PK":"117.84","KM_CARRIL_IMPACTO":"0.29","KM_LINEAL_CALCULADO":"0.12","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.06","KM_IMPACTO_SELLO":"0.23","KM_CARRIL (TOTAL)":"0.29","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.29","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"221.54","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"221.54","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"YEFER ENRIQUE SANCHEZ GONZALEZ","NOMBRE_INGENIERO_APOYO":"ANDRES FELIPE ALDANA CHARRY"},{"_id":90,"CIV":"19009995","PK":"460005","FECHA_INICIO":"2026-01-07 00:00:00","FECHA_TERMINACION":"07/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 4","LOCALIDAD":"CIUDAD BOLIVAR","BARRIO":"SAN RAFAEL","EJE":"KR 19DBIS","DESDE":"CL 70N S","HASTA":"CL 70P S","TIPO DE MALLA":"Intermedia","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Parcheo-Bacheo","AREA_PK":"195.86","LONGITUD PK":"27.93","KM_CARRIL_IMPACTO":"0.06","KM_LINEAL_CALCULADO":"0.03","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.02","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.02","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.02","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"79.36","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"79.36","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":91,"CIV":"19015934","PK":"460032","FECHA_INICIO":"2025-12-26 00:00:00","FECHA_TERMINACION":"05/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 4","LOCALIDAD":"CIUDAD BOLIVAR","BARRIO":"SAN RAFAEL","EJE":"KR 19F","DESDE":"CL 70N S","HASTA":"CL 71 S","TIPO DE MALLA":"Intermedia","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Parcheo-Bacheo","AREA_PK":"542.56","LONGITUD PK":"71.26","KM_CARRIL_IMPACTO":"0.16","KM_LINEAL_CALCULADO":"0.07","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.1","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.1","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.1","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"364.72","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"364.72","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":92,"CIV":"13002758","PK":"34010232","FECHA_INICIO":"2025-12-16 00:00:00","FECHA_TERMINACION":"06/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 2","LOCALIDAD":"TEUSAQUILLO","BARRIO":"CIUDAD SALITRE NOR-ORIENTAL","EJE":"AC 26","DESDE":"Sin Establecer","HASTA":"KR 54","TIPO DE MALLA":"Arterial","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA CICLOINFRAESTRUCTURA","DESCRIPCION_PROGRAMA":"Acuerdo 761/2020/F","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Parcheo-Bacheo","AREA_PK":"694.03","LONGITUD PK":"222.51","KM_CARRIL_IMPACTO":"0.2","KM_LINEAL_CALCULADO":"0.22","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.12","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.12","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.12","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"417.6","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"417.6","NOMBRE_DIRECTOR_OBRA":"CESAR DIEGO ORTIZ CARMONA","NOMBRE_RESIDENTE_OBRA":"ANDREA DEL PILAR PRADA","NOMBRE_INGENIERO_APOYO":"JESICA ALEXANDRA ARDILA DIAZ"},{"_id":93,"CIV":"19012910","PK":"529838","FECHA_INICIO":"2026-01-05 00:00:00","FECHA_TERMINACION":"06/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 4","LOCALIDAD":"CIUDAD BOLIVAR","BARRIO":"SAN RAFAEL","EJE":"KR 19 D BIS S","DESDE":"CL 70 N SUR","HASTA":"CL 70 N SUR","TIPO DE MALLA":"Intermedia","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Misionalidad","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Parcheo-Bacheo","AREA_PK":"143.24","LONGITUD PK":"18.4","KM_CARRIL_IMPACTO":"0.04","KM_LINEAL_CALCULADO":"0.02","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.04","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.04","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.04","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"124.4","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"124.4","NOMBRE_DIRECTOR_OBRA":"DORY ELENA ALVARADO BOYACA","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":94,"CIV":"8004195","PK":"24119977","FECHA_INICIO":"2026-01-30 00:00:00","FECHA_TERMINACION":"30/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 5","LOCALIDAD":"KENNEDY","BARRIO":"CORABASTOS","EJE":"KR 80 C","DESDE":"KR 80 C","HASTA":"DG 38 SUR","TIPO DE MALLA":"Arterial","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Acuerdo 761/2020/A","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Parcheo-Bacheo","AREA_PK":"137.06","LONGITUD PK":"17.47","KM_CARRIL_IMPACTO":"0.04","KM_LINEAL_CALCULADO":"0.02","KM LINEAL CONVENIOS 50%":null,"KM_CARRIL_OBRA":"0.02","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.02","KM CARRIL CONVENIOS 50%":null,"KM CARRIL SUMATORIO":"0.02","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"71.4","AREA 50% CONVENIOS":null,"AREA SUMATORIA":"71.4","NOMBRE_DIRECTOR_OBRA":"MARY LUZ MORA TORRES","NOMBRE_RESIDENTE_OBRA":"JESUS ANTONIO FORERO LOPEZ","NOMBRE_INGENIERO_APOYO":"DIEGO ANDRES FORERO LEON"},{"_id":95,"CIV":"1005336","PK":"136428","FECHA_INICIO":"2025-12-26 00:00:00","FECHA_TERMINACION":"18/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 1","LOCALIDAD":"USAQUEN","BARRIO":"USAQUEN","EJE":"KR 4","DESDE":"TV 2","HASTA":"CL 116","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Convenio UMV-FDL","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Cambio de Carpeta","AREA_PK":"614.83","LONGITUD PK":"78.8","KM_CARRIL_IMPACTO":"0.18","KM_LINEAL_CALCULADO":"0.08","KM LINEAL CONVENIOS 50%":"0.04","KM_CARRIL_OBRA":"0.17","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.17","KM CARRIL CONVENIOS 50%":"0.09","KM CARRIL SUMATORIO":"0.09","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"591.3","AREA 50% CONVENIOS":"295.65","AREA SUMATORIA":"295.65","NOMBRE_DIRECTOR_OBRA":"CESAR DIEGO ORTIZ CARMONA","NOMBRE_RESIDENTE_OBRA":"DIEGO ALEJANDRO MORENO URREGO","NOMBRE_INGENIERO_APOYO":"CRYSTIAN CAMILO AMAYA SUAREZ"},{"_id":96,"CIV":"1005352","PK":"136427","FECHA_INICIO":"2025-12-26 00:00:00","FECHA_TERMINACION":"18/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 1","LOCALIDAD":"USAQUEN","BARRIO":"USAQUEN","EJE":"KR 4","DESDE":"CL 114 A","HASTA":"TV 2","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Convenio UMV-FDL","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Cambio de Carpeta","AREA_PK":"262.5","LONGITUD PK":"35","KM_CARRIL_IMPACTO":"0.07","KM_LINEAL_CALCULADO":"0.04","KM LINEAL CONVENIOS 50%":"0.02","KM_CARRIL_OBRA":"0.08","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.08","KM CARRIL CONVENIOS 50%":"0.04","KM CARRIL SUMATORIO":"0.04","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"262.5","AREA 50% CONVENIOS":"131.25","AREA SUMATORIA":"131.25","NOMBRE_DIRECTOR_OBRA":"CESAR DIEGO ORTIZ CARMONA","NOMBRE_RESIDENTE_OBRA":"DIEGO ALEJANDRO MORENO URREGO","NOMBRE_INGENIERO_APOYO":"CRYSTIAN CAMILO AMAYA SUAREZ"},{"_id":97,"CIV":"1005462","PK":"139132","FECHA_INICIO":"2026-01-19 00:00:00","FECHA_TERMINACION":"26/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 1","LOCALIDAD":"USAQUEN","BARRIO":"USAQUEN","EJE":"CL 113","DESDE":"TV 1","HASTA":"TV 2","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Convenio UMV-FDL","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Cambio de Carpeta","AREA_PK":"545.1","LONGITUD PK":"69","KM_CARRIL_IMPACTO":"0.16","KM_LINEAL_CALCULADO":"0.07","KM LINEAL CONVENIOS 50%":"0.04","KM_CARRIL_OBRA":"0.16","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.16","KM CARRIL CONVENIOS 50%":"0.08","KM CARRIL SUMATORIO":"0.08","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"545.1","AREA 50% CONVENIOS":"272.55","AREA SUMATORIA":"272.55","NOMBRE_DIRECTOR_OBRA":"CESAR DIEGO ORTIZ CARMONA","NOMBRE_RESIDENTE_OBRA":"DIEGO ALEJANDRO MORENO URREGO","NOMBRE_INGENIERO_APOYO":"CRYSTIAN CAMILO AMAYA SUAREZ"},{"_id":98,"CIV":"8009312","PK":"150235","FECHA_INICIO":"2026-01-19 00:00:00","FECHA_TERMINACION":"30/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 5","LOCALIDAD":"KENNEDY","BARRIO":"JACQUELINE","EJE":"CL 48A S","DESDE":"KR 77Y","HASTA":"KR 78","TIPO DE MALLA":"Circuito Movilidad","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Convenio UMV-FDL","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Cambio de Carpeta","AREA_PK":"131.35","LONGITUD PK":"18.5","KM_CARRIL_IMPACTO":"0.04","KM_LINEAL_CALCULADO":"0.02","KM LINEAL CONVENIOS 50%":"0.01","KM_CARRIL_OBRA":"0.04","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.04","KM CARRIL CONVENIOS 50%":"0.02","KM CARRIL SUMATORIO":"0.02","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"131.35","AREA 50% CONVENIOS":"65.68","AREA SUMATORIA":"65.68","NOMBRE_DIRECTOR_OBRA":"SAMUEL SANCHEZ","NOMBRE_RESIDENTE_OBRA":"NELSON YAMIT HERNANDEZ RODRIGUEZ","NOMBRE_INGENIERO_APOYO":"JESICA ALEXANDRA ARDILA DIAZ"},{"_id":99,"CIV":"8009250","PK":"150302","FECHA_INICIO":"2025-12-22 00:00:00","FECHA_TERMINACION":"06/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 5","LOCALIDAD":"KENNEDY","BARRIO":"JACQUELINE","EJE":"KR 78","DESDE":"CL 48A S","HASTA":"CL 49 S","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Convenio UMV-FDL","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Cambio de Carpeta","AREA_PK":"295","LONGITUD PK":"59","KM_CARRIL_IMPACTO":"0.08","KM_LINEAL_CALCULADO":"0.06","KM LINEAL CONVENIOS 50%":"0.03","KM_CARRIL_OBRA":"0.08","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.08","KM CARRIL CONVENIOS 50%":"0.04","KM CARRIL SUMATORIO":"0.04","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"295","AREA 50% CONVENIOS":"147.5","AREA SUMATORIA":"147.5","NOMBRE_DIRECTOR_OBRA":"SAMUEL SANCHEZ","NOMBRE_RESIDENTE_OBRA":"NELSON YAMIT HERNANDEZ RODRIGUEZ","NOMBRE_INGENIERO_APOYO":"JESICA ALEXANDRA ARDILA DIAZ"},{"_id":100,"CIV":"8009257","PK":"150303","FECHA_INICIO":"2025-12-22 00:00:00","FECHA_TERMINACION":"05/01/2026","FECHA -FECHA":"2026-01","ZONA":"ZONA 5","LOCALIDAD":"KENNEDY","BARRIO":"JACQUELINE","EJE":"KR 78","DESDE":"CL 49 S","HASTA":"CL 50 S","TIPO DE MALLA":"Local","DESCRIPCION_ESTRATEGIA":"CONSERVACIÓN DE LA MALLA VIAL URBANA","DESCRIPCION_PROGRAMA":"Convenio UMV-FDL","DESCRIPCION_ACTIVIDAD_AGRUPADA":"Cambio de Carpeta","AREA_PK":"241.04","LONGITUD PK":"50.81","KM_CARRIL_IMPACTO":"0.07","KM_LINEAL_CALCULADO":"0.05","KM LINEAL CONVENIOS 50%":"0.03","KM_CARRIL_OBRA":"0.07","KM_IMPACTO_SELLO":"0","KM_CARRIL (TOTAL)":"0.07","KM CARRIL CONVENIOS 50%":"0.04","KM CARRIL SUMATORIO":"0.04","DESCRIPCION_ESTADO_OBRA":"TERMINADO","TOTAL AREA INTERVENIDA \n(m2)":"239.99","AREA 50% CONVENIOS":"120","AREA SUMATORIA":"120","NOMBRE_DIRECTOR_OBRA":"SAMUEL SANCHEZ","NOMBRE_RESIDENTE_OBRA":"NELSON YAMIT HERNANDEZ RODRIGUEZ","NOMBRE_INGENIERO_APOYO":"JESICA ALEXANDRA ARDILA DIAZ"}], "fields": [{"id": "_id", "type": "int"}, {"id": "CIV", "type": "text"}, {"id": "PK", "type": "text"}, {"id": "FECHA_INICIO", "type": "text"}, {"id": "FECHA_TERMINACION", "type": "text"}, {"id": "FECHA -FECHA", "type": "text"}, {"id": "ZONA", "type": "text"}, {"id": "LOCALIDAD", "type": "text"}, {"id": "BARRIO", "type": "text"}, {"id": "EJE", "type": "text"}, {"id": "DESDE", "type": "text"}, {"id": "HASTA", "type": "text"}, {"id": "TIPO DE MALLA", "type": "text"}, {"id": "DESCRIPCION_ESTRATEGIA", "type": "text"}, {"id": "DESCRIPCION_PROGRAMA", "type": "text"}, {"id": "DESCRIPCION_ACTIVIDAD_AGRUPADA", "type": "text"}, {"id": "AREA_PK", "type": "text"}, {"id": "LONGITUD PK", "type": "text"}, {"id": "KM_CARRIL_IMPACTO", "type": "text"}, {"id": "KM_LINEAL_CALCULADO", "type": "text"}, {"id": "KM LINEAL CONVENIOS 50%", "type": "text"}, {"id": "KM_CARRIL_OBRA", "type": "text"}, {"id": "KM_IMPACTO_SELLO", "type": "text"}, {"id": "KM_CARRIL (TOTAL)", "type": "text"}, {"id": "KM CARRIL CONVENIOS 50%", "type": "text"}, {"id": "KM CARRIL SUMATORIO", "type": "text"}, {"id": "DESCRIPCION_ESTADO_OBRA", "type": "text"}, {"id": "TOTAL AREA INTERVENIDA \n(m2)", "type": "text"}, {"id": "AREA 50% CONVENIOS", "type": "text"}, {"id": "AREA SUMATORIA", "type": "text"}, {"id": "NOMBRE_DIRECTOR_OBRA", "type": "text"}, {"id": "NOMBRE_RESIDENTE_OBRA", "type": "text"}, {"id": "NOMBRE_INGENIERO_APOYO", "type": "text"}], "_links": {"start": "/api/3/action/datastore_search?resource_id=43564269-ea5a-4ad8-b05c-83486661538c", "next": "/api/3/action/datastore_search?resource_id=43564269-ea5a-4ad8-b05c-83486661538c&offset=100"}, "total": 1345, "total_was_estimated": false}}